Plumbing Works

Commercial plumbing and public health engineering (PHE) works — water supply, drainage, sanitary systems and pump rooms for towers, hospitals, hotels and factories across Delhi NCR.

Scope of work

  • CPVC, UPVC, GI and MS pressure piping
  • Underground and overhead tank systems
  • Hydro-pneumatic pump room installation
  • Sanitary fixtures and CP fittings
  • Rainwater harvesting and storm drainage
  • BOQ-based execution, testing and commissioning

How we plan a plumbing package

We start from the architect's toilet layouts and the consultant's BOQ, then prepare shop drawings for shafts, risers and pump rooms before a single pipe is cut. Water demand, tank capacity and pump head are checked against the actual occupancy of the building, because oversized hydro-pneumatic sets are the most common reason for noisy lines and high running cost in Delhi NCR high-rises.

Materials and workmanship

Hot and cold water lines are run in CPVC or GI depending on pressure and temperature, soil and waste in UPVC with solvent-welded joints, and external mains in MS or HDPE where mechanical protection is needed. Every riser is pressure-tested section by section and recorded before shafts are closed, so leaks are found while they are still cheap to fix.

Handover and documentation

Packages close with pressure test reports, pump performance readings, as-built drawings and a walkthrough with the facility team covering valve locations, tank levels and routine maintenance. For housing societies and hotels we also mark isolation points so a single flat or floor can be shut down without draining the building.

Plumbing contracting — common questions

Do you handle both internal plumbing and external drainage?
Yes. We execute internal water supply, sanitary and soil-waste piping along with external sewer lines, manholes, inspection chambers and storm water drainage — as we did on the 3,50,000 sq.ft J.S. School of Architecture campus in Greater Noida.
Can you retrofit plumbing in an occupied building?
Yes. We plan staged shutdowns at night or over weekends so residents and tenants keep water supply during the changeover.
What do you need to quote a plumbing package?
Plumbing drawings or a BOQ, floor count and occupancy, and the tank and pump room details if they already exist. With those we return an itemised, BOQ-linked estimate.